Five stages, one chain

A client can take any one of them, or the whole sequence from the first hazard review to the signed handover certificate.

01

Fire Safety Concept & Strategy

What the facility contains, what can go wrong, and the protection philosophy that follows. Hazard identification, design basis, the definition of what is being protected and to what performance. This is the document every later decision is measured against — and the cheapest place to be right.

02

Engineering Analysis

Where the physics is done rather than asserted.

RiskScenario definition, frequency and consequence, escalation paths, quantitative assessment where the client or the authority requires it.
ThermalRadiation from pool and jet fires, exposure of adjacent equipment and structure, protection criteria and duration.
ExplosionBlast overpressure assessment, dispersion of releases, siting and occupied-building consequences.
Fire waterDemand from the governing scenario, hydraulics, storage and pumping, and what the governing case actually is — which is rarely the largest one.
SmokeSmoke and heat control, visibility and tenability, interaction with ventilation.
EvacuationEgress timing against the developing scenario rather than against a table of travel distances.

03

Design & Documentation

FEED, basic and detailed design of detection and alarm, suppression, fire water supply and distribution, and passive protection — with interface management across process, electrical, instrumentation, civil and structural. Documentation to the level the jurisdiction and the client’s review process require, not to a house template.

04

Owner’s Engineer

Standing in front of the EPC contractor on the client’s side: scope definition, technical requirements for tender, evaluation of what is offered against what was specified, interface and change control, design review of licensor packages, and supervision on site. The role exists because compliance by each party separately does not add up to a protected facility.

05

Technical Assurance & Commissioning

Technical bid evaluation, factory acceptance testing, pre-commissioning, integrated system testing across detection, suppression, shutdown and alarm, witnessing by the authority where required, handover and operator training. We evaluate and verify equipment; we do not supply it.

Earlier is cheaper. The most expensive engagements we see begin when a design is already in front of an authority and does not pass.

Not sure which stage you need?

Describe the facility and where the project stands. We will tell you what is worth doing now and what can wait.